Monday, October 02, 2006

Wiring continues...

Went down to meet the air-con man and the electrician today cuz we wanted some changes in the electrical points. Added on a 2-way switch for the walkway to the bedrooms for convenience, since we wouldn't want to walk out of the room into darkness to find the switch at the living room. Added on some dimmer lights in the MBR for more mood too. For the living room, we are doing without any dimmer lights, since we already have the cove lights and the side panel light from the TV feature wall. Piggy & I felt that we could just buy a standing lamp, which can be dimmed to be placed at the corner of the living room near the long windows.

Talking about lights, really kinda disappointed with Biz link. The manager still haven't responded to us on the availability of the lights we chose. And one of them, the kreon light is really essential for our mirrored feature wall at the dining area. Have called her twice but each time, she is not in the office and said she would check and get back to us. Really hope she will quickly respond to us, cuz the lighting points and false ceiling are expected to be up in another 2 weeks. And I think we need to order and wait for the lights, since it needs to be imported. Really wish we can go to someone else, but I think they are the sole distributor for the light we are eyeing. The Kreon light we are eyeing, as shown. We are thinking of putting one piece in each panel of mirror.

0 Comments:

Post a Comment

<< Home